Dr. Chih Hsiung Wang
My Social Links

Dr. Chih Hsiung Wang

Professor
National Pingtung Institute of Commerce, Taiwan


Highest Degree
Ph.D. in Industrial Engineering from National Taiwan University of Science and Technology, Taiwan

Share this Profile

Area of Interest:

Engineering
100%
Industrial Engineering
62%
Operations Research
90%
EMQ Model
75%
Inspection Policy
55%

Research Publications in Numbers

Books
0
Chapters
0
Articles
34
Abstracts
0

Selected Publications

  1. Tsai, W.C., N.H. Shih and C.H. Wang, 2018. The effects of inspection delay and restoration cost on the optimal inspection and production policy. OPSEARCH, 55: 187-195.
    CrossRef  |  Direct Link  |  
  2. Shih, N.H., Y.S. Liao and C.H. Wang, 2018. Determining an economic production quantity under a zero defects policy. J. Oper. Res. Soc., 69: 1309-1317.
    CrossRef  |  Direct Link  |  
  3. Shih, N.H., M.H. Shu and C.H. Wang, 2018. The effect of full or partial pricing integration on supply chain management. RAIRO-Oper. Res., (In Press). 10.1051/ro/2018113.
    CrossRef  |  Direct Link  |  
  4. Tsai, W.C. and C.H. Wang, 2017. Extended economic maintenance scheduling for a batch production system. J. Inform. Optimiz. Sci., 38: 219-231.
    CrossRef  |  Direct Link  |  
  5. Shin, N.H. and C.H. Wang, 2016. Determining an optimal production run length with an extended quality control policy for an imperfect process. Applied Math. Modell., 40: 2827-2836.
    CrossRef  |  Direct Link  |  
  6. Shih, N.H. and C.H. Wang, 2014. An inspection model of products and their input materials. Syst. Sci. Control Eng., 2: 297-307.
    CrossRef  |  Direct Link  |  
  7. Shih, N.H. and C.H. Wang, 2013. An extended production and inspection model with nonrigid demand. Scient. World J., Vol. 2013. 10.1155/2013/623075.
    CrossRef  |  Direct Link  |  
  8. Wang, C.H. and W.C. Tsai, 2012. Determining the production lot size with a heuristic inspection policy for controlling the quality of input materials and products. Int. J. Syst. Sci., 43: 2030-2039.
    CrossRef  |  Direct Link  |  
  9. Wang, C.H., N.H. Shih and W.C. Tsai, 2011. Utilizing the information theory of entropy to solve an off-line inspection problem. 4OR, 9: 391-401.
    CrossRef  |  Direct Link  |  
  10. Tsai, W.C. and C.H. Wang, 2011. Economic optimization for an off-line inspection, disposition and rework model. Comput. Ind. Eng., 61: 891-896.
    CrossRef  |  Direct Link  |  
  11. Wang, C.H., T. Dohi and W.C. Tsai, 2010. Coordinated procurement/inspection and production model under inspection errors. Comput. Ind. Eng., 59: 473-478.
    CrossRef  |  Direct Link  |  
  12. Wang, C.H., 2010. Some remarks on an optimal order quantity and reorder point when supply and demand are uncertain. Comput. Ind. Eng., 58: 809-813.
    CrossRef  |  
  13. Wang, C.H., 2009. Determining the optimal probing lot size for the wafer probe operation in semiconductor manufacturing. Eur. J. Operat. Res., 197: 126-133.
    CrossRef  |  Direct Link  |  
  14. Wang, C.H. and R.H. Yeh, 2009. Utilizing an approximative solution to obtain the real optimal solution for a production and inspection mode. Applied Math. Modell., 33: 3769-3775.
    Direct Link  |  
  15. Wang, C.H. and F.C. Meng, 2009. Optimal lot size and offline inspection policy. Comput. Math. Appl., 58: 1921-1929.
    CrossRef  |  Direct Link  |  
  16. Wang, C.H., 2008. A game-theoretic approach for determining the economic manufacturing quantity and mutual inspection policy under a quality contract. Operat. Res. Soc. Jap., 51: 274-283.
    Direct Link  |  
  17. Wang, C.H. and C.C. Hung, 2008. An offline inspection and disposition model incorporating discrete Weibull distribution and manufacturing variation. Operat. Res. Soc. Jap., 51: 155-165.
    Direct Link  |  
  18. Wang, C.H., 2007. Economic off-line quality control strategy with two types of inspection errors. Eur. J. Operat. Res., 179: 132-147.
    CrossRef  |  Direct Link  |  
  19. Wang, C.H., R.H. Yeh and P. Wu, 2006. Optimal production time and number of maintenance actions for an imperfect production system under equal-interval maintenance policy. J. Operat. Res. Soc., 57: 262-270.
    CrossRef  |  Direct Link  |  
  20. Wang, C.H., M.H. Shu and I.M. Chao, 2006. Capital investment in set up cost reduction for a lot-size, reorder point model. J. Inform. Optimization Sci., 27: 249-258.
    CrossRef  |  Direct Link  |  
  21. Wang, C.H., 2006. Optimal production and maintenance policy for imperfect production systems. Naval Res. Logistics, 53: 152-156.
    CrossRef  |  Direct Link  |  
  22. Wang, C.H., 2006. A production model with imperfect preventive maintenance. J. Statist. Manage. Syst., 8: 601-613.
    CrossRef  |  Direct Link  |  
  23. Wang, C.H., 2006. A note on a (Q, r) model. J. Statist. Manage. Syst., 9: 689-698.
    Direct Link  |  
  24. Yeh, R.H., H.D. Chen and C.H. Wang, 2005. An inspection model with discount factor for products having Weibull lifetime. Int. J. Operat. Res., 2: 77-81.
    Direct Link  |  
  25. Wang, C.H., 2005. Integrated production and product inspection policy for a deteriorating production system. Int. J. Prod. Econ., 95: 123-134.
    CrossRef  |  Direct Link  |  
  26. Wang, C.H., D.L. Yang, T.H. Wu, W.H. Kuo and N.H. Shih, 2004. Impact of inspection errors on the lot size problem. J. Inform. Optimization Sci., 25: 331-348.
    CrossRef  |  Direct Link  |  
  27. Wang, C.H., 2004. The impact of a free-repair warranty policy on EMQ model for imperfect production systems. Comput. Operat. Res., 31: 2021-2035.
    CrossRef  |  Direct Link  |  
  28. Wang, C.H. and S.H. Sheu, 2003. Optimal lot sizing for products sold under free-repair warranty. Eur. J. Operat. Res., 149: 131-141.
    CrossRef  |  Direct Link  |  
  29. Wang, C.H. and S.H. Sheu, 2003. Determining the optimal production-maintenance policy with inspection errors: using a Markov chain. Comput. Operat. Res., 30: 1-17.
    CrossRef  |  Direct Link  |  
  30. Wang, C.H. and S.H. Sheu, 2001. The effects of the warranty cost on the imperfect EMQ model with general discrete shift distribution. Prod. Plann. Control, 12: 621-628.
    CrossRef  |  Direct Link  |  
  31. Wang, C.H. and S.H. Sheu, 2001. Simultaneous determination of the optimal production-inventory and product inspection policies for a deteriorating production system. Comput. Operat. Res., 28: 1093-1110.
    CrossRef  |  Direct Link  |  
  32. Wang, C.H. and S.H. Sheu, 2000. Fast approach to the optimal production/PM policy. Comput. Math. Appl., 40: 1297-1314.
    CrossRef  |  Direct Link  |  
  33. Wang, H.F. and C.H. Wang, 1999. A fixed-charge model with fuzzy inequality constraints composed by max-product operator. Comput. Math. Appl., 36: 23-29.
    CrossRef  |  Direct Link  |  
  34. Wang, H.F. and C.H. Wang, 1988. Modelling of optimal expansion of a fuzzy competence set. Int. Trans. Operat. Res., 5: 413-424.
    CrossRef  |  Direct Link  |