Dr. Hsiao Fan Wang
My Social Links

Dr. Hsiao Fan Wang

Chair Professor
National Tsing Hua University, Taiwan


Highest Degree
Ph.D. in Operational Research from University of Cambridge, UK

Share this Profile

Area of Interest:

Physical Science Engineering
100%
Supply Chain Management
62%
Fuzzy Control System
90%
Operation Research
75%
Manufacturing
55%

Research Publications in Numbers

Books
15
Chapters
14
Articles
165
Abstracts
140

Selected Publications

  1. Wang, H.F and K.W. Zheng, 2013. Application of fuzzy linear programming to global production plan of a refinery industry-case of taiwan cpc corporation. Int. J. Adv. Manuf. Technol., 64: 169-184.
    CrossRef  |  Direct Link  |  
  2. Wang, H.F. and C.T. Wu, 2012. A strategy-oriented operation module for recommender systems in E-commerce. Comput. Operat. Res., 8: 1837-1849.
    CrossRef  |  
  3. Tsao, R.C and H.F. Wang, 2011. Forecasting in fuzzy systems. Int. J. Info. Tech. Dec. Mak., 10.1142/S021962201100435X.
    CrossRef  |  Direct Link  |  
  4. Wang, H.F and K.W. Zheng, 2010. An optimal Run-mode scheduling for o il refinery production-A case study on taiwan CPC corporation. Prod. Plann. Control, 21: 301-318.
    CrossRef  |  Direct Link  |  
  5. Wang, H.F and H.W. Hsu, 2010. Resolution of an uncertain closed-loop logistics Model: An application to fuzzy linear programs with risk analysis. Int. J. Environ. Manag., 91: 2148-2162.
    CrossRef  |  Direct Link  |  
  6. Wang, H.F and H. Hsin-Wei, 2010. A Closed-loop logistic model with a spanning-tree based genetic algorithm. Comput. Oper. Res, 37: 376-389.
    CrossRef  |  Direct Link  |  
  7. Wang, H.F and C.J. Huang, 2010. A Multi-dimensional data construction method with its application to learning from small-sample-sets. Intell. Data Anal., 14: 121-141.
    CrossRef  |  Direct Link  |  
  8. Huang, C.J., H.J. Chiu, T.H. Lan, H.F. Wang and S.W.kuo et al., 2010. Significance of morphological features in schizophrenia of a chinese population. J. Psychiatr. Res., 44: 63-68.
    CrossRef  |  Direct Link  |  
  9. Chun-Jung, H., W. Hsiao-Fan, C. Hsien-Jane, L. Tsuo-Hung, H. Tsung-Ming and L. El-Wui, 2010. Prediction of Time-points of psychotic episode in individual schizophrenics by data construction and simulations. J. Med. Syst., 34: 799-808.
    CrossRef  |  Direct Link  |  
  10. Wang, H.F., F.C.Hsu, 2009. An integrated operation module for individual risk management. Eur. J. Oper. Res., 198: 610-617.
    CrossRef  |  Direct Link  |  
  11. Wang, H.F. and C.T. Wu, 2009. A mathematical model for product selection strategies in a recommender system. Exp. Syst. Appl. Int. J., 36: 7299-7308.
    Direct Link  |  
  12. Wang, H.F and C.J. Huang, 2009. Application of the data construction method to risk assessment of severe earthquakes in taiwan. Int. Trans. Oper. Res., 16: 189-212.
  13. Tsao, R.C and H.F. Wang, 2009. Analysis of fuzzy regression equations using a fuzzy goal programming model. Int. J. Fuzzy Syst., 11: 107-115.
    Direct Link  |  
  14. Wang, H.F and Z.W. Chan, 2008. A pruning approach to pattern discovery. Int. J. Info. Tech. Dec. Mak., 10.1142/S0219622008003186.
    CrossRef  |  Direct Link  |  
  15. Wang, H.F and C.Y. Kuo, 2008. Overview of fuzzified neural networks with comparison of learning mechanism. Int. J. Fuzzy Syst., 10: 71-83.
    Direct Link  |  
  16. Wang, H.F and W.K. Hong, 2007. An integrated service strategy by QFD approach. Int. J. Manag. Decis. Making, 8: 251-267.
    CrossRef  |  Direct Link  |  
  17. Wang, H.F. and W.K. Hong, 2006. Managing customer profitability in a competitive market by continuous data mining. Ind. Market. Manage., 35: 715-723.
    CrossRef  |  
  18. Wang, H.F and C.Y. Kuo, 2006. 3-Parameter fuzzy arithmetic approximation of L-R Fuzzy number for fuzzy neural networks. Int. J. Uncertainty Knowledge-based Syst., 14: 211-233.
  19. Tsaur, R.C and H.F. Wang, 2006. Solving fuzzy regression equations by using fuzzy goal programming model. WSEAS Trans. Syst., 9: 2033-2039.
    Direct Link  |  
  20. Wang, M.L., H.F. Wang and L. Chi-Long, 2005. Ranking fuzzy number based on lexicographic screening. Inf. Technol. Decis. Making, 4: 663-678.
    CrossRef  |  Direct Link  |  
  21. Wang, H.F and K.Y. Wu, 2005. Preference approach to fuzzy linear inequalities and optimizations. Fuzzy Optim. Decis. Making, 4: 7-23.
    CrossRef  |  Direct Link  |  
  22. Tsau, R.C., O.Y. Jia-Chi and H.F. Wang, 2005. Fuzzy relation analysis in time series analysis. Int. J. Comput. Math. Appl., 49: 539-548.
    CrossRef  |  Direct Link  |  
  23. Hong, W.K and H.F. Wang, 2005. Fuzzy QFD approach to a service strategic plan. Int. J. Fuzzy Syst., 7: 120-132.
  24. Wang, H.F and K.Y. Wu, 2004. Hybrid genetic algorithm for optimization problems with permutation property. Comput. Oper. Res., 31: 2453-2471.
    CrossRef  |  Direct Link  |  
  25. Wang, H.F and G. Ching-Yi, 2004. Factor analysisin data mining. Int. J. Comput. Math. Appl., 48: 1765-1778.
    CrossRef  |  Direct Link  |  
  26. Wang, H.F and K.Y. Wu, 2003. Modeling and analysis for multi-period, multi-product and multi-resource production scheduling. Int. J. Intell. Manuf., 14: 297-309.
    CrossRef  |  Direct Link  |  
  27. Wang, H.F., T. Ruey-Chyn and O.Y. Jia-Chi, 2002. Fuzzy regression analysis for seasonal time series. Int. J. Inf. Technol. Decis. Making, 1: 165-175.
  28. Wang, H.F and Y.B. Wen, 2002. Chinese postman problems with time window. Comput. Math. Appl., 44: 375-387.
  29. Wang, H.F and H. Zhi-Hau, 2002. Top-Down fuzzy decision making with partial preference information. Fuzzy Optim. Decis. Making, 1: 161-176.
    CrossRef  |  Direct Link  |  
  30. Wang, M.L and H.F. Wang, 2001. Interval analysis of a fuzzy multiobjective linear program. Int. J. Fuzzy Syst., 3: 558-568.
  31. Wang, H.F and W.Y. Chang, 2001. Fuzzy scenario analysis in strategic planning. Gen. Syst., 30: 193-207.
    CrossRef  |  Direct Link  |  
  32. Wang, H.F and L. Yi-Chun, 2001. Fuzzy Non-Linear program by parametric programming approach. Fuzzy Sets Syst., 122: 245-251.
    CrossRef  |  Direct Link  |  
  33. Wang H.F and M.L. Wang, 2001. Decision Analysis Of The Interval-Valued Multiobjective Linear Programming Problems. In: Multiple Criteria Decision Making In The New Millennium. Koksalan, M and Z. Stanley (Ed.). Springer, Berlin Heidelberg., pp:210-218.
    CrossRef  |  Direct Link  |  
  34. Long-Shuh, L and W. Hsiao-Fan, 2001. Feature investigation in a learning process. J. Chin. Inst. Ind. Eng., 18: 13-22.
    CrossRef  |  Direct Link  |  
  35. Wang, H.F., 2000. Resolution Of Variational Inequality Problerms By Multiobjective Programming. In: Research and Practice in Multiple Criteria Decision Making. Haimes, Y.Y and E.S. Ralph (Ed.). Springer, Berlin Heidelberg., pp:185-195.
    CrossRef  |  Direct Link  |  
  36. Wang, H.F., 2000. Fuzzy multiobjctive decision analysis-an overview. Int. J. Intell. Fuzzy Syst., 9: 61-83.
  37. Wang, H.F. and R.C. Tsaur, 2000. Insight of a fuzzy regression model. Fuz. Sets Syst., 112: 355-369.
    CrossRef  |  
  38. Wang, H.F and R.C. Tsaur, 2000. Resolution of fuzzy regression model. Eur. J. Oper. Res., 126: 637-650.
    CrossRef  |  Direct Link  |  
  39. Wang, H.F and R.C. Tsaur, 2000. Bicriteria variable selection in a fuzzy regression equation. Comput. Math. Appl., 40: 877-883.
    CrossRef  |  Direct Link  |